Fully Integrated prefabricated modular substation order from Maersk Oil in Kazakhstan

©
Location: Kazakhstan, Dunga oil field
Customer: Maersk Oil company

TGOOD is proud to announce its further growth into the Kazakhstan market, having signed a deal with Maersk Oil Company in late December 2015, for a fully integrated prefabricated 10kV switchgear substation. The substation is 21000mm x 4400mm that is manufactured at TGOOD, transported in sections and connected together on site. The substation itself will contain all our standard high quality systems including HVAC, fire suppression, plus all the fittings as per clients specifications. TGOOD was able to secure this deal due to our incredibly short lead times on production.

Latest News:

A modular substation, prefabricated by TGOOD

Why prefabricated substations are better than bricks and mortar electrical buildings

Fleurhof substation, South Africa

Fleurhof Africa Substation Project

Step-up substations available international power solutions

Green power solutions from Brunstock

TGOOD Successfully Delivers 145kV Pre-fabricated Substation in Thailand

TGOOD Has Launched Their 40.5kV Primary GIS in the Global Market