Some of our recent electrical projects

Switchgear in completed projects

TGOOD Australia has completed a range of projects recently, some of which are summarised below.

Western Downs BESS

Client: UGL

Project value: $7M

TGOOD manufactured a solution consisting of 104 TGS-40.5kV switchgear enclosed in our prefabricated substation kiosks. This project consisted of orders booked in April 2023 and September 2024. The second stage was delivered in July 2025.

TGOOD Australia's completed project building switchgear and substations for Western Downs BESS

P240282, P220704 and P230262

Stanwell BESS

Client: Yurika

Project value: $5.5M

98 of our switchgear panels (TGS-40.5) are now at home in their TGOOD substation enclosures at the Stanwell Power Station. The contract was signed in April 2024 and we finished delivering these substations in July 2025.

A completed project of TGOOD Australia's, conglomerates three images of electricians standing in front of some switchgear and shots of the kiosk substation

P230681

Tomago Kiosks

Client: Undisclosed

Project value: $1M

TGOOD manufactured a solution consisting of two of our custom kiosks (1600kVA) and medium voltage gas insulated secondary switchgear (12kV) with enclosure. The order was booked in November 2023 and delivered in September 2024.

Completed switchger project for Tomago, photos also show the LV board and wiring inside the substation kiosk

P230488

Wakerly Warehouse

Client: UDCS Consulting

Project value: $365,000

TGOOD manufactured a solution consisting of one of our custom kiosks (1600kVA), one of our 315kVA kiosks and medium voltage gas insulated secondary switchgear (12kV) within the enclosure.

Wakerly Warehouse transformers and switchgear substation kiosk

P230487

Glenmore Solar Farm

Client: Trivantage

Project value: $142,000

TGOOD manufactured a solution consisting of one of our 11kV transformer kiosks and a medium voltage gas insulated secondary switchgear (12kV ring main unit).

Glenmore Solar Farm substation kiosk, three photos of the kiosk one with all the doors open, one with the switchgear, one on a truck

P230046

Greenbank BESS

Client: Conpower

Project value: $3M

TGOOD manufactured and delivered this solution, a series of substation kiosks that contained 64 x TGS-40.5. TGS-40.5 is a medium voltage TGOOD gas-insulated secondary switchgear.

Greenbank RMUs three photos, one on site with BESS, one being offloaded by crane at TGOOD Rocklea, one of the kiosk

P230046

Newstead Energy Park

Client: Flow Power

Project value: $260,000

TGOOD manufactured and delivered a MV TGS with Enclosure 12kV and a TDT Oil Transformer 100kVA.

Newstead Energy Park switchgear substation kiosk - three photos of it

P220434

Category

Why choose TGOOD Global?

TGOOD Energy Fast

Our regional subsidiaries have crucial local knowledge and understand what customers need. When combined with the impressive scale of TGOOD’s manufacturing partners, we are an effective and efficient team. This translates into exceptional build quality, cost savings and speed of delivery for you. Launched in 2014, TGOOD Global has executed over 400 power projects in 19 countries. Our team’s comprehensive experience makes us a world leader in substations, including electrical enclosures and the equipment inside them, such as switchgear and power transformers.