TGOOD Global

A mining project ehouse in Switzerland - TGOOD

TGOOD Prefabricated Ehouse Secures Major Industry Projects

View larger image TGOOD Global has recently signed a complex mining project as a supplier to ABB Switzerland Ltd. The project includes more than 50 x TGOOD prefabricated ehouses using patented designs and being delivered to a remote region where temperature reach -58 degrees in temperature.    The acquisition of this complex project again demonstrates […]

TGOOD Prefabricated Ehouse Secures Major Industry Projects Read More »

TGOOD Modular Substation

TGOOD modular substation, soaring in global solar farms

The president of Kazakhstan has visited the Nura solar project, a 110kV modular substation for 100MW solar plant completed by TGOOD. As an international leader in prefabricated substations, TGOOD Global recently completed the construction of 110kV modular substation in Kazakhstan for a 100MW solar plant within a record 5 months while being challenged with -50

TGOOD modular substation, soaring in global solar farms Read More »

TGOOD COVID-19 Crisis

TGOOD’s values shining through the COVID-19 crisis

View larger image In March the world slowed down and focused on fighting the COVID-19 pandemic. Most industries and enterprises were forced to stop, with 80% of energy projects being delayed for an indefinite period.  TGOOD Global’s manufacturing partners resumed their production capabilities to ensure that the TGOOD Global projects would be delivered as early

TGOOD’s values shining through the COVID-19 crisis Read More »

TGOOD Built 110kV Solar Substation

TGOOD Built 110kV Solar Substation in Frozen Land

View larger image   TGOOD Modular 110kV prefabricated substation completed in harshest conditions on the planet. TGOOD Global has completed a turnkey 110kV prefabricated substation in Kazakhstan during a freezing winter. TGOOD designed, manufactured, constructed and commissioned this 110kV substation of an 80MW solar farm within a record 5 months while being challenged with -50

TGOOD Built 110kV Solar Substation in Frozen Land Read More »

TGOOD Indonesian Martabe Gold Mine

Indonesian Martabe Gold Mine Boosts Economic Efficiency with TGOOD

Martabe Gold Mine, the world-class gold mine in Indonesia, has reported stunning achievements in cost savings afforded by TGOOD technology after just 6 months of operation. TGOOD provided a solution to their long-standing power supply problem. Due to excessive harmonic distortion and unbalanced voltage coming from the local network, the mine could not connect to

Indonesian Martabe Gold Mine Boosts Economic Efficiency with TGOOD Read More »

TGOOD Modular Substation

TGOOD’s Modular Substation Won Three Awards

The fifth Gold Dot Award design competition, organised by the infrastructure department of China Southern Power Grid, has officially ended. The competition is designed to extensively collect the design of assembly-type, integrated and modular substations. In the end, TGOOD’s team won three awards with excellent design and outstanding innovative features among hundreds of competitors. One

TGOOD’s Modular Substation Won Three Awards Read More »

TGOOD Fruitful Mechanical Drawing Training

Fruitful Mechanical Drawing Training

The two-week mechanical drawing training conducted by TGOOD Germany has come to the end on 15th December. To improve TGOOD’s drawing quality and deliverable images, Mr Raimund and Mr Andrzej, from TGOOD Germany, a subsidiary of TGOOD Global, carried out the training, especially in ISO standards, requirements and standardised formats to 25 trainees from Qingdao

Fruitful Mechanical Drawing Training Read More »