Modular Substation

The TGOOD 145kV Compact GIS Substation reduces construction times to between 3 and 6 months and uses only 20% of the space required by a traditional substation.

The World’s Most Compact High Voltage Prefabricated Substation

The TGOOD 145kV Compact GIS Substation reduces construction times by 3 to 6 months and uses only 20% of the space required by a traditional substation.

Product Overview

  • TGOOD engineers set out to create a better urban substation, patenting 38 features that combine to create a next generation solution for modern cities and industrial sites around the globe.
  • Increased urbanization and growing demand for electricity necessitates new substation construction in congested built-up areas.
  • Traditional substations create fears of noise and radiation and may be prone to vandalism.
  • Traditional substations require a footprint of up to 3300m² and require at least 18 months to construct, straining scarce land resources and subjecting the area to expensive and unsightly construction projects.

Key Benefits

  • Space Savings
    • Compact substations reduce the land space required to as little as 420m², conserving valuable land in congested urban and industrial areas.
    Safety and Appearance
    • Acoustic and electromagnetic shielding reduce noise and radiation for safe and silent operation (below 40dB). E-House enclosures are safe to touch and provide exceptional protection against vandalism.
    • Custom paintwork helps the station blend in with surroundings.
    Speed
    • Compared to traditional substations, construction times are reduced by 3 to 6 months and commissioning times are reduced to just one month or less.
    • Configurable modules vastly reduce design and manufacturing times.
    • In-house manufacturing of E-House shells and electrical components allow rapid customization.
    • Modular E-House reduces shipping costs and allows for easy transport.
    • TGOOD is strategically located in major port city of Qingdao, China.
    • Rigorous factory testing reduces commissioning times to one month or less.